Rockford Engineering Works Ltd. | Mechanical Engineering in Regina and Southern Saskatchewan
  • Home
  • About Us
  • Services
    • Automation
    • Aftermarket Support
    • EPCM & EPC Contracts
    • Equipment Supply/Fabrication Management
    • Industrial & Mechanical Engineering
    • Installation, Commissioning & Start-Up Services
    • Procurement Management
    • Project Management
  • Projects
    • Mining
    • Piping & Utilities
    • Tube & Pipe Steel Mill
    • Agribusiness
    • Railway
    • Oil & Gas
    • Miscellaneous
  • Careers
  • Client Upload
  • News
    • Blog
  • Contact Us
  • Menu Menu

800-foot Belt Winder

Rockford’s belt winder is one of the only winders capable of reclaiming 800 continuous feet of deployed belt.  After being rolled onto the core, the hydraulically-powered arms lower the roll to the deck where it can be chocked.  The spool hubs then retract allowing the belt to be removed.  The winder accommodates both 48-inch and 60-inch belts.

What We Do

EPCM & EPC Contracts
Project Management
Equipment Supply / Fabrication Management
Installation, Commissioning, & Start Up Services
Industrial & Mechanical Engineering
Procurement Management
Automation
Aftermarket Support

Contact Information

Regina Office
1734 MacRae Drive
Regina, SK, Canada
S4N 7E3

Saskatoon Office
206 – 502 Cope Way
Saskatoon, Sask.
S7T 0G3

Phone: 306.789.0089
Email: info@rockfordworks.com

rockford engineering regina saskatchewan
© Copyright - Rockford Engineering Works Ltd.
  • LinkedIn
  • Twitter
  • About Us
  • Contact Us
  • Client Upload
  • Careers
  • Projects
  • Services
  • News
  • Blog
Belt ThreaderRockford Engineering Works Regina Saskatchewan Canada potash mining belt threader safety deviceRockford Engineering Works Regina Saskatchewan Canada underground mining debris removerDebris Removal
Scroll to top